Critical stabilisation project
Subsidence rectification under a live coal stacker.
The challenge
- ✓Stacker sinking along its rail track
- ✓3 m work windows, every second pier
- ✓Live coal cycles — no downtime allowed
The EMS response
- ✓Staged 2 m excavation under the rail beam footing
- ✓900 mm extension cast, every-second-pier sequencing
- ✓40 MPa pours timed around live stacking cycles
Value delivered
- ✓868 m³ of 40 MPa concrete placed
- ✓14% under budget, on programme
- ✓Zero recordable safety events
- ✓Repeat scope awarded on adjacent Anglo assets

Pit G second portal entry
A second underground entry, delivered around live operations.
The challenge
- ✓Second UG entry/exit needed for production continuity
- ✓Pile caps and 1,500 mm deep beams under existing portal
- ✓Spec mix, epoxy injection — first-time accuracy required
The EMS response
- ✓T16 pile caps installed under the existing portal
- ✓1,500 mm beams cast with 32 mm bar, 80 mm blinder
- ✓Hanson PMP/40/20/80 mix to spec
Value delivered
- ✓Second UG entry/exit delivered to specification
- ✓Existing structure held without movement
- ✓Repeat civil scope awarded on adjacent CAPCOAL works
- ✓Same crew retained for follow-on portal works

Water treatment circular slab
Bespoke circular form, single pour window, finished to spec.
The challenge
- ✓Large diameter slab on critical-path water treatment infrastructure
- ✓Single pour window — no opportunity to re-pour
- ✓Bespoke circular formwork had to be built right the first time
The EMS response
- ✓Pre-pour clean and base course preparation
- ✓Bespoke circular formwork built and set to spec
- ✓Reo install across the full slab diameter
- ✓Single supervised pour with machine finish
Value delivered
- ✓Slab delivered to specification, on programme
- ✓Zero recordable safety events across the works
- ✓QA documentation handed back at completion
- ✓Repeat scope awarded on adjacent WTP works

Conveyor belt recovery & reuse
Turning end-of-life conveyor belting into practical site value.
The challenge
- ✓Used belting creates storage and removal headaches
- ✓Landfill disposal carries cost and environmental impact
- ✓Belt change-outs leave messy sites with nowhere to send the rolls
The EMS response
- ✓Removal and collection of waste belting during shutdowns and change-outs
- ✓Processing of belt material for industrial reuse
- ✓Repurposing into practical site and industrial applications
- ✓ESG-aligned reporting on diverted waste volumes
Value delivered
- ✓103 rolls recovered — 306 tonne diverted from landfill
- ✓Support for ESG and sustainability targets
- ✓Cost-effective waste management alternative
- ✓Tidier sites during major belt change-outs

Single-pass vegetation management
Single pass. No rework.
The challenge
- ✓Brush and regrowth across mine infrastructure and rehab zones
- ✓Operating in MIA, haul roads, ROM pads, fuel farms and laydown areas
- ✓Operator dust and PM exposure to be managed at all times
The EMS response
- ✓Kubota SVL73-3 High Flow CTLs (×2), full RPM at the attachment
- ✓Mulcher, HD slasher and stick rake — gearbox-driven, chain-guarded
- ✓Spray trailers and brush cutters for tight-access detail work
- ✓BreatheSafe pressurised cabs with positive-pressure filtration
Value delivered
- ✓Single-pass mulching — no rework required
- ✓Firebreaks installed and rehab zones cleared
- ✓Zero recordable safety events across the works
- ✓Same crew available for follow-on regrowth campaigns

Project building relocation
Disconnect, transport, rebuild. Live mine site, repeat outcome.
The challenge
- ✓Three-section project building to be moved across the MNC site
- ✓Live mine environment, fixed window, no rework allowed
- ✓Generator, electrical, plumbing and tie-downs all to be re-established
The EMS response
- ✓Building disconnected, split into 3 sections and transported
- ✓Level concrete pads prepped and poured at the new location
- ✓Building re-erected, sealed and re-flashed water-tight
- ✓Cyclone tie-downs, 20,000L water tank and gable awning installed
Value delivered
- ✓Building back in service within the planned window
- ✓Zero recordable safety events across the works
- ✓12 × 12m gable awning and water tank added as a site asset
- ✓Variation works absorbed without programme impact

Dawson South ERT shed
Skillion shed for emergency response training, slab to handover.
The challenge
- ✓New ERT training facility needed on a live mine site
- ✓Civil, structural and electrical scopes under one job
- ✓Tight footprint between existing buildings and services
The EMS response
- ✓6 reinforced concrete piers, 450 dia × 900 deep installed
- ✓100mm slab poured with single layer SL82 mesh
- ✓8 × 8.2m skillion frame and roof supplied and erected
- ✓Electrical run from existing board for lights and trickle feed
Value delivered
- ✓ERT shed delivered to specification, on programme
- ✓Zero recordable safety events across the works
- ✓Single contractor for civil, structural and electrical
- ✓QA documentation handed back at completion

Burton blast & paint
Ongoing structural blast and paint, in-situ and yard, monthly call-off.
The challenge
- ✓Live coal-handling assets needing rolling refurb
- ✓Corroded structural steelwork and coating breakdown
- ✓Containment of blast media in a live plant environment
The EMS response
- ✓Encapsulation with brattice to contain media and dust
- ✓Abrasive blast of structural steel and crusher components
- ✓Inspect, mark-up and repair defective steelwork
- ✓Apply protective coating system to spec — EMS-owned plant on site
Value delivered
- ✓Coal-handling asset life extended
- ✓Zero recordable safety events across the works
- ✓Encapsulation kept media and dust off live plant
- ✓Repeat blast and paint scopes awarded

Grosvenor bathhouse install
Install-only scope on a live site. Civil, structural, plumbing and fit-off.
The challenge
- ✓Footprint sat over live underground services
- ✓Fire main needed relocating to AS spec
- ✓Multi-trade scope, single contractor
- ✓Inclement weather across the build
The EMS response
- ✓Hydro-ex to locate live services
- ✓Fire main relocated outside footprint
- ✓95 posts and PFC supports installed
- ✓Modules craned in and fitted off; plumbing and fire connections completed
Value delivered
- ✓Bathhouse delivered and operational
- ✓Zero recordable safety events
- ✓Single contractor across all trades
- ✓QA pack and engineer sign-offs handed back

Vacuum excavation services
Brand-new mining-spec fleet, ready to deploy across Queensland.
The challenge
- ✓Non-destructive digging around live services
- ✓Safe and efficient service location
- ✓Liquid-waste pump out and removal
The EMS response
- ✓Industrial cleaning of plants and sites
- ✓Sump and pit cleaning — mining and ports
- ✓Conveyor and processing area clean-downs
- ✓Trained crews mobilised from Mackay base
Value delivered
- ✓24/7 emergency callout — spill response and clean-up
- ✓Hazardous waste handling and containment
- ✓Suited to mining, ports and rail sites